Viggiano, Villa d’Agri, (PZ)
Site: Graft Nr. 2 Oil Center Final Client: ENI SpA Contractor: RAM Meccanica
The scope of work consists in Prefabrication and assembly of pipes and supports; assembly of 2 shelter ad Pump rooms.
11 months (May 2021 – Apr 2022)
Piping: kg 160.000 Structures and supports: Kg 125.000 Welding inches: Pollici 6.800″
60 units