EDIPOWER

EDIPOWER

PLACE:

Turbigo (MI)

DESCRIPTION:

Mechanical erection of the Turbigo 800 plant made by 2 boiler of 400 MW item gvr 43 and gvr 44.

DURATION:

13 months (Jan 2007 – Feb 2008)

TOTAL WEIGHT:

Piping:
– Alloy steel (P11 and P91): 69.500 kg
– Carbon Steel: 125.000 kg
Heat Boiler: 132.225 kg
Boiler Inlet Ducts: 198.140 kg
Boiler casing: 506.580 kg
Valves and accessories: 35.000 kg
Equipment (pumps): 25.400 kg
Total erection weight: 1.000 ton

MAN HOURS:

144.000 Hours